No major changes to the design
After we collated the feedback from the community on the Draft Concept plan back in July 2025, there were no major changes required. The community was very happy with the draft plan.
- Community feedback again mentioned that exercise equipment would be desirable. As stated previously, there is no budget remaining for this, however there is space to add exercise equipment to the reserve, should further funding become available in the future.
- Similarly there were requests for a BBQ but there is not enough budget for this addition.
The final design below, does not differ from the Draft concept plan.